The Conner Pad is located in unincorporated Adams County just southeast of Brighton, Colorado. Map by EcoCarto.

Dunamis Energy Operating LLC (having acquired the Conner OGDP from POCO Operating in October 2025) has a permit to drill up to 16 horizontal wells in two occupations from a single working pad surface at East 136th Avenue and Gun Club Road in unincorporated Adams County, about 2 miles east of Barr Lake. As of this writing, two well permits have been abandoned, leaving 14 active well permits. The design uses Modular Large Volume Tanks (MLVTs) in place of open pits, pipeline takeaway for produced oil and gas, and a grid-powered drilling rig and equipment where feasible.

View a full version of the Conner OGDP map , or order a 24″ x 36″ printed map.

The Process

The Conner OGDP was approved by the ECMC commissioners on April 23, 2025 (see Docket 240500107), and Adams County approved the companion Oil and Gas Facility (OGF) permit on March 18, 2025, by a 4–1 vote. No wells have been drilled yet; ECMC’s rules require drilling to begin within three years of approval (April 2028) or the plan expires. Dunamis expects to begin drilling in Fall 2026.

FAQ

How much water will be used?

In their December 2022 Form 2B Cumulative Impacts reports, POCO estimated a total of 7,697,520 barrels (about 323 million gallons) of surface water to be consumed to drill 16 wells at Conner 19-18, for about 20 million gallons per well. This information was not updated for the May 2025 updated cumulative impacts report. The operator does not intend to reuse any produced water for the hydraulic fracturing operations at the Conner pad.

What's this about burrowing owls?

As a part of the OGDP order, “if any burrowing owl is found in the survey required prior to construction, POCO will report the pertinent data to Colorado Parks and Wildlife (CPW) and will consult with CPW to formulate a Burrowing Owl Plan that insures compliance with state statutes and regulations concerning threatened species.”

Contacts

Questions about Dunamis Energy’s plans for the Conner Pad:
Erin Mathews, VP of Regulatory Affairs
erinm@dunamis-energy.com · 970-302-6171

Community Relations Line
community@dunamis-energy.com · 970-344-3055

Questions about Adams County permitting of the Conner Pad:
Greg Dean, Adams County Oil & Gas Administrator
gdean@adamscountyco.gov · 720-523-6891

Questions for the City of Brighton’s Oil & Gas Liaison:
Holly Prather, Community Development Director
HPrather@brightonco.gov · 303-655-2022

If you’re not getting straight answers from any of the above, our team has been following this project closely and is happy to help. Feel free to contact us directly.

Timeline

The Story Thus Far

Sep 17, ’18: Original DSU Established
Petroshare Corp. receives approval from the ECMC for the original Conner drilling and spacing unit (Order 407-2546); the site itself was first permitted at this time but never built.
Sep 4, ’19: PetroShare Files for Bankruptcy
PetroShare Corp files for Chapter 11 reorganization, citing the difficulty of raising capital amid regulatory uncertainty following Colorado’s SB 19-181.
Oct 26, ’22: Neighborhood Meeting
Adams County holds the required community meeting ahead of an Adams County oil and gas facility permit application by Providence Operating, aka POCO.
Apr 30, ’24: OGDP Application Filed
POCO files the Conner 19-18 Oil and Gas Development Plan application, opening ECMC Docket 240500107.
Feb 6, ’25: Application Deemed Complete
ECMC certifies the OGDP application complete and opens a 30-day public comment period.
Mar 18, ’25: County Permit Approved
The Adams County Board of Commissioners approves the local Oil and Gas Facility (OGF) permit on a 4-1 vote, with Commissioner Pinter voting no. Three members of the public provided comment, all in opposition.
Apr 23, ’25: ECMC Approves OGDP
The ECMC Commission approves the Conner 19-18 OGDP and both drilling and spacing unit orders (Order 407-3717).
Oct 5, ’25: Well Permits Approved
ECMC approves individual drilling permits for all 16 Conner wells.
Oct 31, ’25: Ownership Transfer
POCO Operating sells the Conner 19-18 OGDP to Dunamis Energy Operating LLC, the current operator at the Conner pad.

Proposed Drilling/Completions Schedule

Scant details are available about the proposed drilling and completions schedule; we’ll update as information becomes available.
Fall ’26
The operator has indicated drilling will begin at the Conner pad in Fall 2026.
2027
Dunamis will begin a second occupation at the Conner pad in 2027 to drill the remaining wells; we presume an even 8/8 split of wells between the two occupations.
Mar 18, ’28: Adams County Permit Expires
All wells on the Conner pad must be drilled and completed to meet Adams County permit conditions.

More Information

We’ve assembled the documents below from application materials submitted to the ECMC; see the disclaimer below. Visit the ECMC Hearings eFiling System, select the DNRCOG Search for Docket Related Documents option and search for Docket 240500107 for a complete listing of docket-related documents.

Conner OGDP Map
A detailed map provided by our partners at EcoCarto showing the existing and proposed oil & gas infrastructure, as well as the health-risk radii for the Conner OGDP in Adams County, just southeast of Brighton, Colorado.
Adams County Permitting Summary
A summary of the Adams County conditional approval of the Conner Oil and Gas Facility (OGF) written by Greg Dean, Adams County Oil & Gas Administrator.
May 2025 Updated Form 2B Cumulative Impacts Report
An update to the original December ’22 Form 2B filed by POCO Operating, indicating that an electric drilling rig and production equipment will be used.
Conner 19-18 OGDP Application
The original application filed by POCO Operating in April 2024, describing the proposed 16-well pad, its location southeast of Brighton, and how the site will be built, drilled, and operated.
CDPHE Comments on the Conner OGDP
The Colorado Department of Public Health and Environment’s review of the application, covering the air quality and public health commitments POCO agreed to before the project moved forward.
ECMC Director’s Recommendation
ECMC staff’s own review of the Conner application, recommending approval and laying out the conditions attached to that recommendation.
Conner 19-18 OGDP Final Order
The Commission’s official order approving the Conner OGDP, formally granting POCO Operating permission to drill and produce the 16 approved wells.
Change of Operator (Form 4 Sundry Notice)
ECMC’s record of the October 2025 sale of the Conner OGDP from POCO Operating to Dunamis Energy Operating LLC, the project’s current operator.

Disclaimer